Aerospace Engineering · Worked example

Hohmann Transfer Worked Example: 7000 km Orbit to Geostationary Radius

Calculate circular speeds, two Hohmann burns, total delta-v, and transfer time from a 7000 km Earth-centered orbit to geostationary radius.

By 9 minute readPublished 2026-08-11Reviewed 2026-08-11

Why this calculation matters

A Hohmann transfer is the minimum-energy two-impulse transfer between two coplanar circular orbits in the ideal two-body model. It is an excellent hand-check for orbital-mechanics software because the equations are closed form.

This example transfers from a 7000 km Earth-centered circular orbit to the geostationary orbital radius of 42,164 km. The result excludes plane change, launch-site geometry, finite burn duration, atmospheric effects, and perturbations.

What you will calculate

  • Calculate circular-orbit velocity.
  • Use the vis-viva equation on the transfer ellipse.
  • Compute both ideal impulsive delta-v burns.
  • Calculate half-period transfer time and understand the model limitations.

Given values

  • Earth gravitational parameter μ = 398600.44 km³/s²
  • Initial circular radius r1 = 7000 km
  • Final circular radius r2 = 42164 km
  • Coplanar, prograde, impulsive burns
  • Two-body point-mass gravity

Governing equations

Circular speed

vc = √(μ/r)

Speed in an ideal circular orbit.

Transfer semimajor axis

at = (r1 + r2)/2

The Hohmann ellipse is tangent to both circular orbits.

Vis-viva

v = √[μ(2/r − 1/a)]

Gives transfer-ellipse speed at each burn radius.

Transfer time

t = π√(at³/μ)

Half the period of the transfer ellipse.

Worked solution

1. Calculate the two circular speeds

At 7000 km radius the circular speed is about 7.546 km/s. At geostationary radius it is about 3.075 km/s. Higher circular orbits move more slowly even though more energy is required to reach them.

v1 ≈ 7.546 km/s; v2 ≈ 3.075 km/s

2. Define the transfer ellipse

The transfer semimajor axis is the average of the two radii: 24,582 km. The spacecraft must accelerate at perigee to enter this ellipse.

at = (7000 + 42164)/2 = 24582 km

3. Calculate the departure burn

Vis-viva gives a transfer-ellipse speed at r1 greater than the original circular speed. The difference is the first ideal burn.

Δv1 ≈ 2.337 km/s

4. Circularize at the high orbit

At apogee the transfer-ellipse speed is lower than the final circular speed, so a second prograde burn raises the speed to circular velocity.

Δv2 ≈ 1.434 km/s; total Δv ≈ 3.771 km/s

5. Calculate transfer time

Half of the transfer ellipse takes about 5.33 hours. This is coast time between ideal instantaneous burns, not total mission time.

t ≈ π√(24582³/398600.44) ≈ 5.33 h
Result

Engineering interpretation

Ideal Hohmann burn 1: approximately 2.337 km/s; burn 2: approximately 1.434 km/s; total ideal delta-v: approximately 3.771 km/s; coast time: approximately 5.33 h.

A real geostationary mission usually has inclination, launch, finite-thrust, operational, and reserve requirements that make mission delta-v different from this idealized two-body transfer.

Sanity checks

  • The first burn for an outward Hohmann transfer should be prograde.
  • The transfer speed at apogee should be below the final circular speed, requiring a second prograde burn.
  • Swapping r1 and r2 should reverse the burn directions while preserving the ideal magnitude relationship.
  • Units must remain consistent: μ in km³/s² requires radii in km to obtain km/s.

Common mistakes

  • Using altitude above Earth instead of Earth-centered orbital radius.
  • Calling 42,164 km an altitude; it is the approximate geostationary radius from Earth center.
  • Ignoring plane-change cost when the initial orbit is inclined.
  • Using Hohmann equations for a transfer where burns are not approximately impulsive.

References and model boundaries

  • Two-body circular-orbit, vis-viva, and Hohmann-transfer equations from standard astrodynamics references.
  • Operational mission design requires perturbations, plane changes, finite burns, reserves, and navigation constraints beyond this example.

For safety-critical, regulated, production, or otherwise consequential work, independently verify the result using the governing standard, current manufacturer data, and qualified engineering review. See the site methodology and engineering disclaimer.